  Bailey is a kind of equipment that will be used in the construction activities, Bailey used for a long time there will be cracks, we should be how to prevent the cracks from occurring. There are cracks in after how should we control? Everybody is very curious, today we are going to see, in addition to asphalt mixture as what the process is, and Hunan Bailey Xiaobian together look down!
  The asphalt concrete pavement construction should choose the function of Bailey is complete, mix asphalt paver and the mechanical properties of the advanced operation level operator.
  Conduct intermediate inspection to lower level in time. Local treatment of the lower bearing layer roughness can not meet the requirements of the code.
  The Hunan Bailey will carefully check and maintenance of the paving machine, avoid paver in mixture paving process downtime due to mechanical failure.
  According to the width of pavement paver ironing plate assembly, should ensure that the hot plate composite width symmetrical, flat bottom surface, so as to avoid the asphalt mixture in the paving process cross section's thickness is inconsistent.
  After placing the paver in place, adjust the height of the ironing plate and the initial working elevation of the paver according to the slope of the road, the height and the thickness of the loose paving, and evenly cover with three pieces of wood board to avoid the deformation and instability of the ironing plate.
  The Hunan Beilei hot plate is heated to 100 DEG C, so as not to start paving asphalt mixture bonded at room temperature in the hot plate below, increasing the paver starting resistance, the hot plate in the paving material surface with a stick of stretch marks, the smoothness of the road surface.
  The paver paving material began to stick slowly when started, at the same time, the hot plate of the vibrating system vibration frequency should be normal when paving low. To use the manual leveling, slipper for paver behind the balance beam walk to all qualified mixture paving surface when leveling and automatic leveling system of paver, this can in a short distance from the paving smoothness of pavement.
  Green concrete pavement construction should choose the function of Bailey is complete, mix asphalt paver and the mechanical properties of the advanced operation level operator. Conduct intermediate inspection of lower levels in a timely manner. Local treatment of the lower bearing layer roughness can not meet the requirements of the code. Careful inspection and maintenance of paving machines, to prevent the paver in the mixture paving process due to mechanical failures. According to the width of pavement paver ironing plate assembly, should ensure that the hot plate composite width symmetrical, flat bottom surface, so as to avoid the asphalt mixture in the paving process cross section's thickness is inconsistent.